HydraulicMoundou, Chad

Drinking Water Supply (AEP)

  • Year: 2020 – 2022
  • Status: Delivered
  • Contract: Public Tender (EPC)

Project Summary Sheet

Client & Beneficiary
Chad's Ministry of Water & Moundou community
Scope of Intervention
Drilling, treatment, supply and distribution
Capacity / Output
15,000 m³/day
Integrated Technology
Hybrid thermal-solar pumping, potabilization plant
Institutional Partners
World Bank, Ministry of Water
Execution Timeline
24 months, delivered on schedule

OVERVIEW

Durably supplying Moundou's population

The Moundou Drinking Water Supply (AEP) project covers the entire hydraulic value chain: from deep geological drilling to final distribution to local households and industries, including treatment and potabilization.

ENERSO developed integrated water supply and sanitation projects, relying on hybrid pumping technologies to ensure continuous flow while minimizing operating costs in this decentralized territory.

Drinking Water Supply (AEP)Active water supply station

TECHNICAL & LOGISTICAL CHALLENGES

Water stress and treatment quality

  • Seasonal water stress

    Deep boreholes reaching resilient confined aquifers to overcome seasonal variations in water resources.

  • Treatment quality

    Establishment of a potabilization plant compliant with international drinking water quality guidelines.

THE ENERSO RESPONSE

A complete and durable water infrastructure

ENERSO deployed high-performance hybrid (thermal-solar) pumping technologies, ensuring continuous flow while minimizing the carbon footprint and operating costs, from abstraction to final distribution to households and industries.

IMPACT & RESULTS

Durably secured access to drinking water

15,000 m³

Daily Production

Volume of drinking water produced and distributed daily since commissioning.

25,000+

Households Served

Households now having access to drinking water via the AEP network.

97%

Network Availability

Distribution network availability rate measured since commissioning.

12

Boreholes Drilled

Number of deep boreholes drilled to supply the distribution network.

SITE & OPERATIONS GALLERY

TALK TO AN EXPERT

Let's deploy your next infrastructure project together

Contact our technical and financial experts to structure your project and secure your assets.

Discuss your project