ENERSO
SolarN'Djamena, Chad

20 MW Solar Plant

  • Year: 2022 – 2023
  • Status: Operational
  • Contract: IPP (20 years)

Project Summary Sheet

Client & Beneficiary
Chad's Ministry of Energy & SNE
Scope of Intervention
Design, construction, operations & maintenance (20 years)
Capacity / Output
20 MW
Integrated Technology
Multi-fuel thermal units, redundant SCADA
Institutional Partners
African Development Bank, ENERSO Finance
Execution Timeline
14 months, delivered on schedule

OVERVIEW

Securing the capital's solar electricity supply

The 20 MW Solar Plant continuously supplies power to N'Djamena's distribution networks and surrounding industrial zones. Built as an Independent Power Producer (IPP), it relies on a solar photovoltaic infrastructure operated by ENERSO for the full duration of the contract.

ENERSO oversaw the entire lifecycle of the infrastructure, from engineering studies to day-to-day operations and maintenance, working directly with the National Electricity Company (SNE).

20 MW Solar PlantOperational 20 MW Solar Plant

TECHNICAL & LOGISTICAL CHALLENGES

Grid reliability and extreme climate conditions

  • Reliability in Sahelian climate

    Design of active cooling systems to guarantee thermal unit reliability under high ambient temperatures.

  • Fuel logistics

    Secure delivery and buffer storage of fuel to guarantee continuous supply without disruption.

THE ENERSO RESPONSE

Digitally managed hybrid operations

ENERSO deployed a redundant SCADA supervision system paired with digital preventive maintenance, smoothing the load curve and maintaining contractual availability above 95% since commissioning.

IMPACT & RESULTS

Critical performance indicators validated by SNE

12,000 t

CO2 Emissions Avoided

Reduction in carbon footprint by replacing the isolated diesel units previously in use.

60,000+

Households Connected

Equivalent power supply capacity supporting the growth of surrounding neighborhoods.

95%+

Contractual Availability

Guaranteed availability rate under O&M standby duty since commissioning.

-10%

Production Cost

Reduction in the average unit cost per kWh injected compared to isolated diesel solutions.

SITE & OPERATIONS GALLERY

TALK TO AN EXPERT

Let's deploy your next infrastructure project together

Contact our technical and financial experts to structure your project and secure your assets.

Discuss your project